The team at Arfaix Fit Out helps businesses with full DEWA (Dubai Electricity and Water Authority) approval services for your fit-out and interior projects throughout Dubai. The DEWA approval process remains essential for commercial, retail and office spaces to establish electrical and water connections because we maintain efficient and compliant support that adheres to Dubai’s established guidelines.

As a trusted office fit-out company in Dubai, Arfaix Fit Out & Interior Design extends complete support to obtain DEWA approvals for electrical and water connection works. Our company takes full responsibility for managing every step including drawing development alongside scheduling estimations and DEWA inspections until the final connection process.

Our team of DEWA-registered engineers together with our extensive understanding of regulatory standards allows us to make sure your fit-out projects acquire necessary approvals rapidly and correctly. 

Read More: DDA Approval

DEWA Approval Process

1. Appoint a DEWA-Registered Electrical Engineer

2. Online Application Submission (Getting NOC)

3. Technical Review by DEWA

4. Provisional Approval (NOC) Issued

5. On-Site Work Execution

6. Inspection Request & Final Approval

Requirements for DEWA Approval

  1. Electrical Load Increase / New Connection
  2. Water Supply Connection / Modifications

Documents Required for DEWA Approval

  1. Trade License Copy – The required documents include Trade License Copies which belong to the client and fit-out contractor.
  1. DEWA Application Form – A properly signed and filled DEWA Application Form presents as one of the required documents.
  1. Affection Plan / Site Plan – Provided by the landlord or developer.
  1. Tenancy Contract / Title Deed – Proof of space allocation.
  1. NOC from Developer / Landlord – Allowing submission to DEWA.
  1. Consultant Appointment Letter – If applicable.
  1. Load Calculation Sheet – The Load Calculation Sheet determines the electrical load demands for analysis.
  1. Load Distribution Schedule – The Load Distribution Schedule presents the distribution method for circuit loads.
  1. Method Statement & Risk Assessment (RAMS) –The RAMS document functions as a methodology to identify and manage safety hazards within any risky work process.

Read More: Concordia Approval

Drawings Required for DEWA Approval

  1. Electrical Drawings
  1. Water & Plumbing Drawings (if applicable)

Why Choose Arfaix Fit Out & Interior Design?

The company provides fast-track approval services through its team’s comprehensive experience at Dubai’s major development sites by taking charge of technical documents together with DEWA communication and post-submission follow-ups. The team at Arfaix Fit Out ensures appropriate standards compliance with DEWA which results in time savings as well as minimization of efforts and delays.