Arfaix Fit Out & Interior Design stands as a leading office fit out contractor in the Dubai & provider of interior construction solutions for TECOM and DDA business areas in Dubai. We provide complete DDA/TECOM fit-out approval services which includes design submissions followed by landlord coordination and permits until completion certification.

Our team of experts provides seamless project execution by comprehending both DDA building regulations and TECOM guidelines and Dubai fire and safety requirements which leads to on-time completion with full compliance. Arfaix Fit Out makes your designs become real by providing precise professional services.

The Dubai Development Authority (DDA) has control over design and construction approvals for all facilities belonging to the TECOM Group such as Dubai Internet City, Dubai Media City, Dubai Knowledge Park, Dubai Studio City, and other sites.

Building Permit Department at DDA needs to grant project approval for all fit-out operations occurring in TECOM zones before construction activities begin.

Read More: DEWA Approval

DDA / TECOM Fit-Out Approval Process

1. Pre-Submission Coordination

2. Submission of Preliminary Documents

3. Detailed Drawing Submission to DDA

4. Review & Modifications

5. Permit Issuance

6. Site Inspections

7. Final Inspection & Completion Certificate

Read More: Concordia / DMCC Approval

Requirements for DDA / TECOM Fit-Out Approval

Documents & Drawings Required for DDA / TECOM Fit-Out Approvals

Documents Required:

  1. Fit-Out Application Form – Submitted via the DDA e-permit portal.
  1. Trade Licenses – Both the tenant and the contractor must provide their trade licenses as per requirements.
  1. NOC from Landlord / TECOM – No Objection Certificate for the fit-out.
  1. Consultant & Contractor Appointment Letters
  1. Risk Assessment & Method Statement (RAMS) – The Risk Assessment and Method Statement known as RAMS presents vital information to the reader.
  1. Fire & Life Safety Compliance Report – If applicable.
  1. Valid Insurance Certificates – Workmen Compensation, Third-Party Liability.
  1. Work Program / Project Timeline
  1. Waste Management & Disposal Plan
  1.  MEP Load Calculations – Especially for HVAC and Electrical systems.

Drawings Required:

1.  Architectural Layout Drawings

2.  MEP Drawings

3. Fire Safety Drawings

4. Structural Drawings (if any modifications)